Well, the help that was lined up for my HVAC buddy can't come on board until next week. The install on the fifteen ton unit was scheduled for this week. Yesterday, to be exact. So, once again, I played ladder monkey to help him out. Strange thing is I did twice the work but am not nearly as sore. My knees are smarting a good bit, but that's it. No muscle pains or aches at all.
Things went a little haywire with the gas and electric stuff. We ended up having to rip out and redo all the wiring, beginning at the junction box inside the building. Then we had to relocated the gas line because the curb adapter totally covered the old gas riser. That set us back a couple of hours. Then the Economizer ended up being a total Charlie Foxtrot. Trane must have retarded monkeys writing the instructions. They were awful. The same monkeys must be packaging them, too. It was done so poorly that one of the screens was crushed. What should have been a 45 minute job ended up taking almost three hours. In the end we didn't get it operational but we did get all the big two-man stuff done. All Brian had to finish this morning was run one piece of gas flex, hook up the new stat, and set up the efficiency kit.
Brad